Gruzin Geo

Poland’s Centralny Port Komunikacyjny (CPK) advances key rail project with high-speed connection between Warsaw and Łódź

  • sotter sotter
  • October 12, 2023
  • 0

A substantial advancement has taken place in Poland’s major infrastructure endeavor, Centralny Port Komunikacyjny (CPK), with the establishment of a high-speed railway connecting Warsaw and Łódź, pivotal rail freight hubs in the country. The Connecting Europe Facility (CEF) is set to finance this crucial railway, with CPK and the Polish Ministry of Funds and Regional Policy signing a 64 million euros agreement with the Centre for EU Transport Projects. This funding, covering approximately 85 percent of the total project costs amounting to 75 million euros, will support comprehensive project documentation, including construction plans, and facilitate the necessary permits and location decisions.

The CPK hub, envisioned as a comprehensive transportation nexus integrating air, road, and rail freight along with passenger transport, is a strategic focus of EU investment. In 2021, over 24 million euros from CEF funds were allocated for feasibility studies on the Warsaw-Łódź-Sieradz-Poznań line and the construction of the tunnel in Łódź. Emphasizing rail freight, the CPK initiative prioritizes intermodality, emphasizing container and semi-trailer transport. The project also entails the development of a new terminal near the airport and the construction of additional terminals along CPK’s railway network. This multifaceted approach aims to revolutionize Poland’s transportation system. Notably, the Warsaw-Łódź line is central to the North Sea-Baltic Corridor of the TEN-T network within the European Union, and it forms a crucial segment of the “Y” railway, connecting major Polish rail freight hubs such as Wrocław and Poznań to Warsaw and Łódź.

Image source: https://www.railfreight.com/railfreight/2023/10/12/cpk-new-warsaw-lodz-railway-to-be-financed-through-cef/

Leave a Reply