Gruzin Geo

COSCO SHIPPING Taurus successfully tests shore-side power at HHLA Container Terminal Tollerort

  • sotter sotter
  • October 5, 2023
  • 0

The inaugural test of the shore-side power station at HHLA Container Terminal Tollerort (CTT) has been successfully conducted with the COSCO SHIPPING Taurus, marking a significant step toward eco-friendly port operations. As part of a collaboration involving the Hamburg Port Authority (HPA), Siemens, COSCO, and HHLA, the test demonstrated the successful integration of technical components for shore power supply. The station, strategically located at the mega-ship berth capable of handling the world’s largest container vessels, utilizes special cables to connect the ship to the shore-side power infrastructure.

The COSCO SHIPPING Taurus, equipped with integrated electrotechnical components, joins a series of newer vessels from COSCO that support shore power supply. The technology and processes have undergone thorough testing to ensure compatibility and effectiveness. By connecting to shore-side electricity from renewable sources, the vessel’s diesel engines can be switched off while berthed, leading to a significant reduction in greenhouse gas emissions and harmful substances. HPA is conducting further tests to expedite the deployment of shore-side power stations across the Port of Hamburg, promoting sustainable and climate-friendly maritime practices.

HHLA is actively contributing to the development of sustainable logistics solutions through its “Balanced Logistics” initiative, aligning with the goal of achieving climate-neutral production across the Group by 2040. Shore-side power stations are being established at key HHLA container terminals, including Tollerort and Burchardkai (CTB), with plans for additional stations, such as the one at Container Terminal Altenwerder, to further advance eco-conscious port operations.

Image source: https://hhla.de/en/media/news/detail-view/shore-side-power-station-at-ctt-first-ship-test-successful

Leave a Reply