{"id":17504,"date":"2026-03-25T00:00:00","date_gmt":"2026-03-25T00:00:00","guid":{"rendered":"https:\/\/gruzingeo.com\/fs-engineering-completes-delhi-meerut-rrts-corridor\/"},"modified":"2026-03-25T00:00:00","modified_gmt":"2026-03-25T00:00:00","slug":"fs-engineering-completes-delhi-meerut-rrts-corridor","status":"publish","type":"post","link":"https:\/\/gruzingeo.com\/ka\/fs-engineering-completes-delhi-meerut-rrts-corridor\/","title":{"rendered":"FS Engineering completes Delhi\u2013Meerut RRTS corridor."},"content":{"rendered":"<section class=\"entry-content\">\n<p>FS Engineering, the engineering arm of Italy\u2019s FS Group, has completed its role as general consultant for the Delhi\u2013Meerut Regional Rapid Transit System (RRTS) corridor in India.<\/p>\n<p>The Delhi\u2013Meerut line forms part of the Namo Bharat RRTS programme and is designed for a maximum operating speed of 180 km\/h. The corridor links Delhi with Meerut in under one hour and represents India\u2019s first regional rapid transit system for high-speed intercity services.<\/p>\n<p>On the Meerut\u2013Modipura section, the infrastructure will also accommodate metro services operating at up to 120 km\/h. According to project data, this makes it the fastest metro operation currently in India.<\/p>\n<p>FS Engineering provided consultancy services covering design and commissioning phases of the project. The inauguration ceremony was attended by Prime Minister Narendra Modi and Uttar Pradesh Chief Minister Yogi Adityanath.<\/p>\n<p>The new Sarai Kale Khan station in Delhi forms a key interchange on the corridor, connecting with the Delhi Metro, Hazrat Nizamuddin railway station and the ISBT bus terminal. The station is planned as a hub for future RRTS routes towards Panipat\u2013Karnal and Alwar.<\/p>\n<p>Once ongoing projects in the region are completed, the Delhi metropolitan public transport network is projected to reach 750 km in length.<\/p>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>FS Engineering, the engineering arm of Italy\u2019s FS Group, has completed its role as general consultant for the Delhi\u2013Meerut Regional Rapid Transit System (RRTS) corridor in India.<\/p>","protected":false},"author":2,"featured_media":17505,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[33],"tags":[],"class_list":["post-17504","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-europe"],"acf":[],"_links":{"self":[{"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/posts\/17504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/comments?post=17504"}],"version-history":[{"count":0,"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/posts\/17504\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/media\/17505"}],"wp:attachment":[{"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/media?parent=17504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/categories?post=17504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gruzingeo.com\/ka\/wp-json\/wp\/v2\/tags?post=17504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}