{"id":13308,"date":"2025-03-03T00:00:00","date_gmt":"2025-03-03T00:00:00","guid":{"rendered":"https:\/\/gruzingeo.com\/baltic-hub-has-completed-test-handling-operations-at-the-new-t3-berth\/"},"modified":"2025-03-03T00:00:00","modified_gmt":"2025-03-03T00:00:00","slug":"baltic-hub-has-completed-test-handling-operations-at-the-new-t3-berth","status":"publish","type":"post","link":"https:\/\/gruzingeo.com\/ru\/baltic-hub-has-completed-test-handling-operations-at-the-new-t3-berth\/","title":{"rendered":"Baltic Hub has completed test handling operations at the new T3 berth."},"content":{"rendered":"<section class=\"entry-content\">\n<p>Baltic Hub successfully completed test handling operations on the first vessel handled at the new T3 berth, an important milestone in the terminal\u2019s development. This event opens up new prospects for expanding the hub\u2019s operational capabilities.<\/p>\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1160\" height=\"869\" src=\"https:\/\/gruzingeo.com\/wp-content\/uploads\/2025\/11\/dji-20250224165252-0032-d-1160x869-1.jpg\" alt=\"Baltic Hub has completed test handling operations at the new T3 berth.\" class=\"wp-image-11225\" title=\"Sea Baltic Hub has completed test handling operations at the new T3 berth.\"><figcaption class=\"wp-element-caption\">Baltic Hub<\/figcaption><\/figure>\n<p>On February 24, the CMA CGM TIVOLI, a 205-meter feeder powered by environmentally friendly LNG, arrived at the terminal, in line with Baltic Hub\u2019s strategy to reduce CO\u2082 emissions. During the test operations, 1,474 TEU were handled, which allowed not only to test new technologies, but also to optimize the operation of the STS cranes.<\/p>\n<p>Baltic Hub expressed gratitude to the team for their professionalism, as well as to CMA CGM for their cooperation and participation in the testing.<\/p>\n<\/section>","protected":false},"excerpt":{"rendered":"<p>Baltic Hub successfully completed test handling operations on the first vessel handled at the new T3 berth, an important milestone in the terminal\u2019s development. This event opens up new prospects for expanding the hub\u2019s operational capabilities.<\/p>","protected":false},"author":2,"featured_media":13309,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[38],"tags":[],"class_list":["post-13308","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sea"],"acf":[],"_links":{"self":[{"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/posts\/13308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/comments?post=13308"}],"version-history":[{"count":0,"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/posts\/13308\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/media\/13309"}],"wp:attachment":[{"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/media?parent=13308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/categories?post=13308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gruzingeo.com\/ru\/wp-json\/wp\/v2\/tags?post=13308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}