Gruzin Geo

Uncategorized

  • By sotter sotter
  • August 15, 2024

VTG supplies new hopper wagons to Mendip Rail.

On 5 August, the first of the HOA hopper wagons built for VTG by Greenbrier in Poland arrived at Whately station. These new HOA hopper wagons will replace the ageing LTF and O&K JHA models that have been in service with Mendip Rail for almost 35 years. The remainder of the order will be completed and delivered by May 2025.

  • By sotter sotter
  • August 15, 2024

Kazakhstan and Hong Kong signed a memorandum on transport cooperation.

Kazakh Transport Minister Marat Karabayev and Hong Kong Legislative Council Representative Frankie Ik Chi-ming held talks in Astana, focusing on developing cooperation in the field of transport and logistics. They discussed the prospects for partnership between Kazakhstan and Hong Kong, as well as the exchange of experience in implementing advanced technologies in the transport industry.

  • By sotter sotter
  • August 14, 2024

Kronospan acquires terminal in Riga port and launches export to USA.

In early July, SIA Kronospan Riga, one of the world’s leading manufacturers of wood-based panels, completed the acquisition of the KS Terminal Ltd cargo terminal in the Port of Riga, becoming the sole owner of the company. This acquisition will strengthen Kronospan’s position in Northern Europe and create new strategic opportunities for the terminal’s growth.

  • By sotter sotter
  • August 14, 2024

Central Asian ministers strengthen transport cooperation in Astana.

The transport ministers of Kazakhstan, Kyrgyzstan, Tajikistan, Turkmenistan and Uzbekistan met in Astana ahead of the VI Consultative Meeting of the Heads of State of Central Asia. During the talks, the issues of developing transit corridors, rail and road transport, as well as air traffic, were discussed. Particular attention was paid to strengthening transport connectivity through the construction of new roads and expansion of air traffic.

  • By sotter sotter
  • August 13, 2024

The construction of the Rail Baltica bridge enters a new stage.

In July 2024, contractor Rizzani de Eccher began a new stage of construction of the Rail Baltica bridge over the Neris River near Jonava, delivering steel sheet piles to the site. These works will create a temporary protective perimeter, which will allow for the safe installation of the bridge supports. Once the work is completed, the perimeter will be dismantled.