The port of Aktau is preparing for dredging to fully load tankers.
In June, dredging works aimed at restoring the design depth to 7.7 meters will start in the Aktau seaport. This was announced by the Chairman of the Board of the Aktau International Sea Trade Port Abay Turikpenbayev at the Caspian and Central Asia forum in Baku. Currently, due to the lowering of the Caspian Sea level, tankers cannot be fully loaded – instead of 12 thousand tons, they take about 10 thousand.
