The port of Kuryk is expanding its water area and increasing the capacity of its terminals.
The port of Kuryk is actively developing infrastructure, and large-scale dredging work is underway. According to the general director of the port, Serik Akhmetov, the bottom is planned to be deepened by 1.5-2 meters, which will allow reaching a depth of 36.5 meters according to the “Baltic mark”. This will make it possible to increase the port water area to 7-7.5 meters.
